We record
- the price and the price-level date
- what it is made of, and where the data comes from
- the risks and the assumptions
- what is missing, and what is not included
- how long it is valid, and under what conditions
Is it worth it, does it fit the budget, what will it cost? From screening to tender price, we tell you what the figure is made of, what the risks are, what is not included, and how long it is valid.
10+years in construction
Then, the work
Transparent preparation.
Five short topics: how we help, how we work, the four steps, the example programs, and who is behind them.
Services
How we work
A clear workflow: itemised figures, a source next to every line, and one responsible professional at the end.
Five steps in the workflow
Process
Our tools
We built the three programs below as examples: each one can replace a single step in a workflow. What we offer companies goes further: we build AI-assisted workflows for faster, more precise work.

01 · Cost estimating
Estimates a family house from the basic data, the structure, the level of finish and the room schedule, broken down by trade, with a schematic floor plan and three structural variants of the same house.
What you get: a range, not a single figure, with a derivation you can follow line by line and a list of what the estimate does not include.

02 · Foundations
From the dimensions of strip, raft and pad foundations it calculates indicative concrete volume (m³), reinforcement weight, formwork area and the number of truck mixer loads; unit rates and output norms are editable.
What you get: an itemised breakdown and a material order list you can copy to the clipboard, for guidance only: it does not replace the structural design.

03 · Scheduling
From the building type, the structure, the floor area, the start date and the working pattern it produces an order-of-magnitude schedule in 14 phases, in a Gantt view, allowing for the winter shutdown.
What you get: the dates of the start, completion and main milestones (foundations complete, structure complete, weathertight, handover), as CSV or printed.
The tools give indicative results: not a quotation, not a bill of quantities and not a construction design. Every result is checked by a professional.
About us

I am Csaba Major. I work as an AI specialist with construction expertise: I build AI workflows and my own AI tools for construction.
By original profession I am a building construction technician with 10+ years in construction. That expertise is my edge: I know what to ask on a drawing set, and what is missing from a quote. AI agents speed up the research, the comparison and the calculation; I check every result as a professional and take responsibility for it.

Questions
Contact
We reply in writing: what we can calculate from them, what is still missing, and by when we can deliver.
Email · the first round in writing
info@nulladikfazis.hu
The subject line and a short template appear in your email program automatically.
The first round takes place in writing, based on your documents.
A more direct conversation about whether we can help your company.
Depending on the project, arranged separately.